The water diversion project from Gu county Reservoir in Luoyang - China

Water
City
Luoyang
Country
China
Year
2015
Associated ranges
Features
Large Diamater Pipes
Geographical zones
Asia
Markets
Water

Project specifications

Public contracting authority: Luoyang Beikong Raw Water Co. Ltd.

Construction company: The 3rd Engineering Company of China Tiesiju Civil Engineering Group (CTCE) Co. Ltd.

Length: 22.6 KM

Application: raw water transferring

DN: 1 600

This project is to transfer the raw water from the Gu county Reservoir downstream to the water plant in Luoyang high-tech zone and Guanlin water plant, totally 132 km.

Project features

  • Over long-distance water transferring
  • Large diameter and big scale

Outcome

  • Provide 22.6 km of K8 DN1600 DI pipes
  • STD joints were used, which resulted in  quick installation
  • No delay for the project

Service

  • Provide optimized logistic plan
  • Carry out soil corrosion test
  • Technical assistance on site